Factors affecting delays in rail transportation projects using Analytic Network Process: the case of Iran
Tavassolirizi, Mohsen; Sarvari, Hadi; Chan, Daniel W.M.; Olawumi, Timothy O.
Abstract
Delays in the implementation and commissioning of rail transportation projects can cause economic dam-ages to project stakeholders and the cities linked by such rail networks. Hence, the current study aims toinvestigate the key delay factors and provides salient recommendations. In this study, multi-criteria deci-sion-making–the Analytic Network Process (ANP) and the DEMATEL (Decision Making trial and evalu-ation laboratory) method was employed to help decision-makers in prioritizing these delay factors andevaluating their interactions, respectively. A Delphi approach was used to validate the study’s findings viaexpert questionnaire surveys–based on a rail transportation development project for the MobarakehSteel Complex (MSC). The study’s findings revealed the management factors as the most important delayfactors, followed closely by the financial, design, and implementation factors. Other potent issues includethe existence of numerous decision-making stations, lack of central role, and sufficient authority for theproject managers are responsible for project delays. Overall, the results show that resolving problemswith the‘management’domain can significantly avoid or alleviate the extent of delays in rail transporta-tion development projects. The study’s findings and recommendations can serve as a policy and consulta-tive instrument for the relevant stakeholders in the railway industry.
Journal Article Type | Article |
---|---|
Acceptance Date | Sep 11, 2020 |
Online Publication Date | Sep 21, 2020 |
Publication Date | 2022 |
Deposit Date | Oct 15, 2021 |
Publicly Available Date | Oct 18, 2021 |
Journal | International Journal of Construction Management |
Print ISSN | 1562-3599 |
Electronic ISSN | 2331-2327 |
Peer Reviewed | Peer Reviewed |
Volume | 22 |
Issue | 14 |
Pages | 2712-2723 |
DOI | https://doi.org/10.1080/15623599.2020.1819946 |
Keywords | Project delays, rail transportation project, Analytic Network Process (ANP), DEMATEL, Iran |
Public URL | http://researchrepository.napier.ac.uk/Output/2813402 |
Files
Factors Affecting Delays In Rail Transportation Projects Using Analytic Network Process: The Case Of Iran (accepted version)
(877 Kb)
PDF
You might also like
Integration of Building Services in Modular Construction: A PRISMA Approach
(2024)
Journal Article
Multi-Attribute Analysis For Sustainable Reclamation Of Urban Industrial Sites: Case From Damascus Post-Conflict
(2024)
Presentation / Conference Contribution
A Review of the Benefits of Automation and Robotic Application in Building Construction
(2024)
Presentation / Conference Contribution
Downloadable Citations
About Edinburgh Napier Research Repository
Administrator e-mail: repository@napier.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2024
Advanced Search