Strengthening of the Örnsköldsviks Bridge with Near Surface Mounted CFRP Rods

Kerrouche, Abdelfateh

Authors



Abstract

During June/July 2006 a full scale loading of a railway bridge up to failure was carried out in Sweden. The opportunity to make this loading came up due to partly upgrade the old line and partly building of a new railway line, the Botnia Line, between Sundsvall and Umeå in Swe-den. This then lead to that some bridges along the old line had to be demolished. One of the redundant bridges was located in Örnsköldsvik, a small town 600 km north of Stockholm.
The project was a part of the European funded research project Sustainable Bridges (www.sustainblebridges.net).

Citation

Kerrouche, A. (2007). Strengthening of the Örnsköldsviks Bridge with Near Surface Mounted CFRP Rods. European Commission

Report Type Project Report
Publication Date Nov 30, 2007