Skip to main content

Research Repository

Advanced Search

Development of a New Hydro Power Device

People Involved

Project Description

The development and preliminary evaluation of a device harnessing hydro power from the nearby river Tweed, the main objectives are:- measurement, modelling and simulation project designed to fully investigate and analyse the device and its power performance and survivability

Status Project Live
Funder(s) Energy Technology Partnership
Value £9,996.00
Project Dates Feb 27, 2024 - Oct 18, 2024

You might also like

A critical evaluation of large scale direct-drive wind turbine electrical machines manufacturing techniques considering sustainability aspects and recyclability issues Nov 22, 2021 - Sep 21, 2022
Direct-driven generators are low speed machines requiring robust and heavy supporting structures capable of withstanding a demanding set of loads. It has been reported that at least 2/3 of the total machine mass corresponds to the supporting structur... Read More about A critical evaluation of large scale direct-drive wind turbine electrical machines manufacturing techniques considering sustainability aspects and recyclability issues.

Portable Solar Kiln Mar 1, 2022 - Aug 31, 2022
DLT is a mass timber product that can be used for floor, wall, and roof structures. It is structurally very efficient and economical to use in construction.

As part of the process to make DLT, the wood requires to be kiln dried. Ligna Alba Ltd ha... Read More about Portable Solar Kiln.

Development and Optimisation of the Dolphin Wave Energy Converter Oct 1, 2023 - Mar 31, 2027
The Dolphin Wave Energy Converter will be analysed and optimised using different techniques. Experimental and theoretical work will be required to come up with an optimum device capable of gathering energy from the sea waves motion.