Ayse Aslan
Lead time prediction with the Bosch production line dataset
Aslan, Ayse; Vasantha, Gokula; El-Raoui, Hanane; Quigley, John; Hanson, Jack; Corney, Jonathan; Sherlock, Andrew
Authors
Dr Gokula Vasantha G.Vasantha@napier.ac.uk
Associate Professor
Hanane El-Raoui
John Quigley
Jack Hanson
Jonathan Corney
Andrew Sherlock
Citation
Aslan, A., Vasantha, G., El-Raoui, H., Quigley, J., Hanson, J., Corney, J., & Sherlock, A. Lead time prediction with the Bosch production line dataset. [Dataset]
Deposit Date | Sep 7, 2022 |
---|---|
Publicly Available Date | Mar 29, 2024 |
Public URL | http://researchrepository.napier.ac.uk/Output/2912661 |
Collection Date | Sep 4, 2022 |
Files
Lead Time Prediction Bosch Dataset Case Study
(527.2 Mb)
Archive
Case Study 2-simulated Production Line
(95.8 Mb)
Archive
You might also like
Hierarchical ensemble deep learning for data-driven lead time prediction
(2023)
Journal Article
A Knowledge Graph Approach for State-of-the-Art Implementation of Industrial Factory Movement Tracking System
(2023)
Conference Proceeding
Movement Tracking-Based In-Situ Monitoring System for Additive Manufacturing
(2023)
Conference Proceeding
Data-driven Discovery of Manufacturing Processes and Performance from Worker Localisation
(2023)
Conference Proceeding
Downloadable Citations
About Edinburgh Napier Research Repository
Administrator e-mail: repository@napier.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2024
Advanced Search