Ayse Aslan
Lead time prediction with the Bosch production line dataset
Aslan, Ayse; Vasantha, Gokula; El-Raoui, Hanane; Quigley, John; Hanson, Jack; Corney, Jonathan; Sherlock, Andrew
Authors
Dr Gokula Vasantha G.Vasantha@napier.ac.uk
Associate Professor
Hanane El-Raoui
John Quigley
Jack Hanson
Jonathan Corney
Andrew Sherlock
Citation
Aslan, A., Vasantha, G., El-Raoui, H., Quigley, J., Hanson, J., Corney, J., & Sherlock, A. Lead time prediction with the Bosch production line dataset. [Data]
Deposit Date | Sep 7, 2022 |
---|---|
Publicly Available Date | Aug 8, 2023 |
Public URL | http://researchrepository.napier.ac.uk/Output/2912661 |
Collection Date | Sep 4, 2022 |
Files
Case Study 2-simulated Production Line
(95.8 Mb)
Archive
Lead Time Prediction Bosch Dataset Case Study
(527.2 Mb)
Archive
You might also like
Safer and Efficient Factory by Predicting Worker Trajectories using Spatio-Temporal Graph Attention Networks
(2024)
Presentation / Conference Contribution
Design Of A Serious Game For Safety In Manufacturing Industry Using Hybrid Simulation Modelling: Towards Eliciting Risk Preferences
(2024)
Presentation / Conference Contribution
Hierarchical ensemble deep learning for data-driven lead time prediction
(2023)
Journal Article
A Knowledge Graph Approach for State-of-the-Art Implementation of Industrial Factory Movement Tracking System
(2023)
Presentation / Conference Contribution