Grant MacKerron
Supplier replenishment policy using E-Kanban: a framework for successful implementation.
MacKerron, Grant; Kumar, Maneesh; Kumar, Vikas
Authors
Maneesh Kumar
Vikas Kumar
Abstract
This paper provides generic implementation guidelines for an electronic supplier Kanban in the form of an eight-step implementation Framework. This has been tested, proven and realised, providing a clear process to follow. The steps provide a clear process from mapping and analysing the current situation, an analysis of potential suppliers with corresponding criteria, and an analysis of purchased items and bottlenecks in their use within the organisation. This includes a review of the types of Kanban, Kanban loop, supplier preparation for using the system and then the integration of processes to ensure success in its use. Operational issues are comprehensively covered, together with strategic aims and underlying problems that may impact upon success. The above approach can be used to both introduce new suppliers to the system and give assistance to other companies wishing to implement an e-supplier Kanban.
Citation
MacKerron, G., Kumar, M., & Kumar, V. (2014). Supplier replenishment policy using E-Kanban: a framework for successful implementation. Production Planning and Control, 25(2), 161-175. https://doi.org/10.1080/09537287.2013.782950
Journal Article Type | Article |
---|---|
Acceptance Date | Mar 25, 2013 |
Online Publication Date | May 9, 2013 |
Publication Date | 2014 |
Deposit Date | Jan 27, 2012 |
Publicly Available Date | May 9, 2013 |
Journal | Production Planning and Control |
Print ISSN | 0953-7287 |
Electronic ISSN | 1366-5871 |
Publisher | Taylor & Francis |
Peer Reviewed | Peer Reviewed |
Volume | 25 |
Issue | 2 |
Pages | 161-175 |
DOI | https://doi.org/10.1080/09537287.2013.782950 |
Keywords | e-Kanban; Supplier replenishment; e-Kanban; supplier; framework; case study; implementation; |
Public URL | http://researchrepository.napier.ac.uk/id/eprint/4945 |
Publisher URL | http://dx.doi.org/10.1080/09537287.2013.782950 |
Contract Date | Jan 27, 2012 |
Files
Supplier replenishment policy using E-Kanban...
(614 Kb)
Document
Downloadable Citations
About Edinburgh Napier Research Repository
Administrator e-mail: repository@napier.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search